Tide Tables
🌐 English

Home › Tide tables & water levels › Fort Pulaski, Savannah River Entrance

Fort Pulaski, Savannah River Entrance water levels in 1992

Annual rank31 / 88
vs. average3.7 cm
Highest monthly peak1.73 mSeptember 1992

Monthly mean vs. previous year

Month1992 (cm)1991 (cm)DiffPeak (m)
Jan-8.70.4-9.11.41
Feb-6.0-14.88.81.39
Mar-15.7-4.8-10.91.27
Apr-3.8-2.9-0.91.38
May5.96.5-0.61.50
Jun11.710.80.91.60
Jul-7.51.0-8.51.56
Aug-2.32.6-4.91.45
Sep13.820.5-6.71.73
Oct19.319.00.31.55
Nov8.66.52.11.65
Dec-7.5-15.17.61.45

Nearby years (cm vs. average)

Monthly means are relative to the station's mean sea level (MSL) datum.

← 19911993 →

About this page

The 1992 annual mean water level ranked 31 of 88 years (3.7 cm vs. the period average).